The Philippines remains the top wind producer in Southeast Asia with its 33MW wind turbines that started operation in 2005. A study by the US National Renewable Energy Laboratory (US NREL) shows that there are 10,000 sq.km. of land areas with good-to-excellent wind resources here in the country. Using the conservative assumption of about 7MW per sq. km., these windy areas could support a potential installed capacity of 70,000 MW. Most of these windy areas can be found in the northern part of the country, particularly in the Ilocos region.
Increase in consumption
total additional power generation capacity needed (from renewable and non-renewable energy source): 4,000 4,350 MW
Visayas and Mindanao islands are starting to experience power shortages
around 23 power plants with an estimated total capacity of 557 MW are being targeted by the government by 2014 (333 MW in the Northern Luzon Agribusiness Quadrangle, 124 MW in Metro Manila Urban Beltway, 85 MW Central Philippines, and 15 MW in Mindanao).
generation of wind energy increased from 25MW in 2005 to 33 MW in 2008
Natural Resources
Philippines potential for wind energy is attributed to its location in the Asia-Pacific monsoon belt.
total wind potential installed capacity of 70,000-76,600 MW
over 10,000 sq. km. land areas estimated to exist with a good-to-excellent wind resource potential
wind power density at 500 W/m2
Technology Situation
wind turbine active stall type
resource assessment on selected sites by wind mapping
grid-connected wind farms
Support industries/infrastructure
high voltage backbone system of interconnected transmission lines, sub-stations and related facilities exist in Luzon, Visayas and Mindanao
Luzon Grid 19,271 MVA, Visayas Grid 3,269 MVA, Mindanao Grid 2,103 MVA
National Grid Corporation of the Philippines (NGCP) is a corporate body that is responsible for the planning, construction and centralized operation and maintenance of high-voltage transmission facilities, including grid interconnection and ancillary services
the best wind resources are found in the following regions:
1. Higher interior terrain of Luzon, Mindoro, Samar, Leyte, Panay, Negros, Cebu, Palawan, eastern Mindanao and adjacent islands
2. Islands of Batanes and Babuyan, north of Luzon
3. Northwest tip of Luzon (Ilocos Norte)
4. Well-exposed east-facing coastal locations from northern Luzon southward to Samar
5. Wind corridors between Luzon and Mindoro (including Lubang Island)
6. Between Mindoro and Panay (including the Semirara Islands and extending to the Cuyo Islands)
Wind mapping is the process the helps the DOE to determine potential wind farms in the country:
Luzon (456.5 MW)
Ilocos Norte (183 MW)
Ilocos Sur (40 MW)
Pangasinan (60 MW)
Nueva Ecija (50MW)
Quezon (50 MW)
Laguna (25MW)
Marinduque (8.4 MW)
Occidental Mindoro (10 MW)
Oriental Mindoro (20 MW)
Romblon (10.10 MW)
Visayas (85 MW)
Masbate (5 MW)
Negros Occidental (30 MW)
Antique (40 MW)
Aklan (10 MW)
Mindanao
Surigao del Sur (15 MW)
Human resources
Manpower Requirement
- Engineers
- Meteorologists
- Plant Operators
- Maintenance personnel
- Administrative staff
Availability
- 517,427 total graduates in 2009
- 63,919 graduates of various Engineering courses
Quality
- competitive labor forces
- world-class English language proficiency with capability with some Asian languages
- fast learning curve (needs only 6-8 weeks to learn technical skills)
- long tradition of excellence in the professions
- strong work ethics and customer orientation
- universal cultural adaptation
Existing company
North Wind Power Development Corporation (33 MW) in Bangui Bay, Ilocos Norte
Growth in numbers of wind power plants
USDOE-NREL study showed that out of the 73 provinces in the Philippines 47 have at least 500 MW in wind potential and 25 with at least 1,000 MW
there are 6 wind farm projects under development:
PNOC-EDC 140 MW in Ilocos
UPC Asia (100 MW)
Energy Logics (40-60 MW)
A Spanish firm in Burgos Province (10-15 MW)
Aklan Project (10-15 MW)
Bulalacao Project (40 MW)
23 new plants are expected to be on-stream by 2014
New investments
The recently passed Philippine Renewable Energy Act of 2008 is expected to accelerate the exploration and development of renewable energy resources in the Philippines and that includes wind.
Increasing share in electricity generation
current installed capacity of 33 MW represents less than 1% of total power generation capacity
by 2014, installed capacity is expected to reach 590 MW or 2.9% of the total power generation capacity
Rural employment opportunities
the industry provides opportunities for direct labor sourced particularly from rural areas
Increasing contributions to the economy
will continue to contribute to foreign exchange savings as it substitutes imported fuel oil
will be a substantial earner of foreign exchange though carbon credits under the Clean Development Mechanism
Enabling laws/policies
Renewable Energy Act of 2008 (R.A. 9513) establishes the necessary infrastructure and mechanism to carry out the governments thrust to promote the development, utilization and commercialization of renewable energy sources which includes wind energy
-promotes the purchase, grid connection and transmission of electricity generated from renewable energy sources to ensure its market
-provides incentives such as exemption from various taxes and duties to renewable energy developers to make investments more attractive
Development plans and programs
intensify development and utilization of renewable energy sources and technology
Market support
To contribute to the growth of the renewable energy industry by diversifying energy supply, the Renewable Portfolio Standards (RPS) policy requires electricity suppliers to source a certain portion of their energy supply from eligible wind energy sources.
Feed-in Tariff or price premium for electricity produced from eligible RE resources like wind
Technical/R&D support
Government identifies potential sites of wind energy resources through wind mapping
assists private entities that have identified frontier areas by providing technical and financial assistance in further determining if these areas warrant the establishment of a wind farm.
Tapping of Japanese technology to jump-start the development of wind energy projects
Financial Support
Project Preparation Fund (PPF) managed by the Land Bank of the Philippines
Loan Guarantee Fund (LGF) LGU Guarantee Corporation, and Banco de Oro Universal Bank will act as Program Manager and Escrow Agent, respectively
New and Renewable Energy Financing Programme (NREFP) managed by the Development Bank of the Philippines
United Nations Development Programme-Global Environment Facility
Philippine Export-Import Credit Agency
Fiscal Incentives:
Income Tax Holiday (ITH) for 7 years
Duty-Free Importation of RE Machinery, Equipment and Materials
Special Realty Tax Rates on Equipment and Machinery.
Net Operating Loss Carry-Over (NOLCO)
Corporate Tax Rate of 10% on net taxable income after 7 years of ITH
Accelerated Depreciation
Zero Percent Value-Added Tax Rate
Tax Exemption on Carbon Credits
Tax Credit on Domestic Capital Equipment and Services value-added tax and custom duties
Other Benefits
Renewable Portfolio Standard
Priority connection to the grid
Priority purchase and transmission by the grid system operators
Feed-in Tariff or price premium for electricity produced
Average Investment Cost
P 84.6 Million/MW (US$ 1.8 Million/MW)
Salaries and wages
Monthly Salary Range (in US dollars @ $1=P48)
Engineers/Meteorologists 833 to 854
Plant Operators 458 to 479
Maintenance Personnel 438 - 458
Administrative Staff 583 to 625
Taxes and royalties
The Government share on development projects is equal to one percent (1%) of the gross income resulting from the sale of renewable energy produced and such other income incidental to and arising from the renewable energy generation.

Address: 6F Salustiana D. Ty
104 Paseo De Roxas, Legaspi Village
1209 Makati City, PHILIPPINES
Tel: +63 2 5538841,
+63 2 5538842,
+63 905 3130064.
Fax: +63 2 5530874.
Email: info@tripleiconsulting.com

Please fill up the form below for your inquiries. Someone will contact you shortly